Publisher's Synopsis
This text presents a survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered.
2nd Edition
Paperback (18 Jul 2012)
Save $8.48
Includes delivery to the United States
10+ copies available online - Usually dispatched within 7 days
This text presents a survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered.
ISBN: | 9783642072659 |
Publisher: | Springer Berlin Heidelberg |
Imprint: | Springer |
Pub date: | 18 Jul 2012 |
Edition: | 2nd Edition |
DEWEY: | 658.53 |
DEWEY edition: | 22 |
Language: | English |
Number of pages: | 385 |
Weight: | 558g |
Height: | 235mm |
Width: | 155mm |
Spine width: | 21mm |