Publisher's Synopsis
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows.
Second Edition 2003rd edition
Hardback (18 Jun 2003)
Includes delivery to the United States
10+ copies available online - Usually dispatched within 7 days
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows.
ISBN: | 9783540401254 |
Publisher: | Springer Berlin Heidelberg |
Imprint: | Springer |
Pub date: | 18 Jun 2003 |
Edition: | Second Edition 2003rd edition |
Language: | English |
Number of pages: | 385 |
Weight: | 778g |
Height: | 307mm |
Width: | 348mm |
Spine width: | 26mm |