Delivery included to the United States

The Miami Valley Flood-Protection Work

The Miami Valley Flood-Protection Work Five Articles Published in Engineering News During January and February 1917: Fixing Maximum Flood Limits, Why Retarding Basins Were Adopted, Dam and Outlet Problems, Study of Retarding-Basin Operation, New Features

Hardback (09 Jan 2018)

Not available for sale

Out of stock

This service is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Publisher's Synopsis

Excerpt from The Miami Valley Flood-Protection Work: Five Articles Published in Engineering News During January and February 1917: Fixing Maximum Flood Limits, Why Retarding Basins Were Adopted, Dam and Outlet Problems, Study of Retarding-Basin Operation, New Features in the Specifications

Therefore several men were sent to Washington and spent eight months there, abstracting the entire storm rainfall records of the country.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Book information

ISBN: 9780428620431
Publisher: Fb&c Ltd
Imprint: Forgotten Books
Pub date:
Number of pages: 32
Weight: 204g
Height: 229mm
Width: 152mm
Spine width: 6mm