Publisher's Synopsis
The six Middle Rio Grande Pueblos have prior and paramount rights to deliveries of water from the Rio Grande for their use. When the pueblos or the Bureau of Indian Affairs Designated Engineer identifies a need for additional flow on the Rio Grande, the Designated Engineer is tasked with decid-ing the timing and amount of releases of prior and paramount water from storage at El Vado Reservoir to meet the needs of the pueblos. Over the last three decades, numerous models have been developed by Federal, State, and local agencies in New Mexico to simulate, understand, and (or) manage flows in the Middle Rio Grande upstream from Elephant Butte Reservoir.