Publisher's Synopsis
Excerpt from Specifications and Contract for a Masonry Dam and Spillway: October, 1896
The contract which the bidder and sureties promise to enter into shall be. In its general provisions. In the form adopted by The Pioneer Electric Power Company and furnished herewith. Parties making bids are to be understood as accepting the terms and condi tions contained in such form of contract.
Reasonable grounds for assuming that a bidder is interested in more than one bid for the. Same item will cause the rejection of all bids in which he is supposed to be interested.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.