Delivery included to the United States

Report to the Board of Public Improvements on the Water Supply of St. Louis (Classic Reprint)

Report to the Board of Public Improvements on the Water Supply of St. Louis (Classic Reprint)

Hardback (18 Feb 2018)

Not available for sale

Out of stock

This service is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Other formats & editions

New
Hardback (23 Apr 2016) $33.97

Publisher's Synopsis

Excerpt from Report to the Board of Public Improvements on the Water Supply of St. Louis

The working capacity of the Bissell's Point Station at present can not be placed higher than 55 million gallons per day. As soon as the two new triple expansion pumps are installed, which will be before May 1st, 1913, the working capacity of this station will be 75 millions.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Book information

ISBN: 9780656865345
Publisher: Fb&c Ltd
Imprint: Forgotten Books
Pub date:
Number of pages: 104
Weight: 295g
Height: 229mm
Width: 152mm
Spine width: 8mm