Delivery included to the United States

Molecules to Medicine with Mtor: Translating Critical Pathways Into Novel Therapeutic Strategies

Molecules to Medicine with Mtor: Translating Critical Pathways Into Novel Therapeutic Strategies

Hardback (11 Mar 2016)

Save $7.71

  • RRP $122.15
  • $114.44
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies. Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.

Book information

ISBN: 9780128027332
Publisher: Elsevier Science
Imprint: Academic Press
Pub date:
DEWEY: 612.398
DEWEY edition: 23
Language: English
Number of pages: 472
Weight: 1574g
Height: 224mm
Width: 285mm
Spine width: 30mm