Publisher's Synopsis
This technical requirement applies to logistics line for gigafactory machine for prismatic aluminium can cells, performing material docking and conveying from the second filling machine unloading cover 1m position to the sealing nail welding machine and from sealing nail welder to the second helium test machine unloading position.