Delivery included to the United States

Independent Verification of the Mitigating Systems Performance Index (Mspi) Results for the Pilot Plants

Independent Verification of the Mitigating Systems Performance Index (Mspi) Results for the Pilot Plants

Paperback (09 Jun 2014)

  • $24.19
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

In its Reactor Oversight Process (ROP), the U.S. Nuclear Regulatory Commission (NRC) currently uses performance indicators to quantify safety system unavailability (SSU) for four important nuclear power plant systems. Over time, the NRC staff has identified a number of concerns related to the use of these indicators, including the use of short-term unavailability to approximate unreliability, the use of generic performance thresholds irrespective of variations in risk significance, and potential double-counting as a result of support system failures cascading onto front line systems. Moreover, the way the SSU indicators currently measure unavailability is inconsistent with the definition in the NRC's Maintenance Rule, as well as the indicators promulgated by the World Association of Nuclear Operators and the Institute of Nuclear Power Operations.

Book information

ISBN: 9781500139988
Publisher: Createspace Independent Publishing Platform
Imprint: Createspace Independent Publishing Platform
Pub date:
Language: English
Number of pages: 224
Weight: 530g
Height: 280mm
Width: 216mm
Spine width: 12mm