Delivery included to the United States

Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina

Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina

Paperback (09 Jun 2014)

  • $36.60
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

On February 28, 2001, Duke COGEMA Stone & Webster (DCS or the applicant), a limited liability company, submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to construct a Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF or the facility) on the U.S. Department of Energy's (DOE) Savannah River Site near Aiken, South Carolina. DCS is a DOE contractor. If its construction authorization request (CAR), as revised, is approved, DCS is expected to then submit a license application for authority to possess and use licensed material at the MFFF. Following an acceptance review of such an application, a notice of opportunity for hearing would be published in the Federal Register. In support of its revised CAR, DCS has submitted several items to the NRC, including a quality assurance plan and an environmental report.

Book information

ISBN: 9781500140083
Publisher: Createspace Independent Publishing Platform
Imprint: Createspace Independent Publishing Platform
Pub date:
Language: English
Number of pages: 562
Weight: 1284g
Height: 280mm
Width: 216mm
Spine width: 29mm