Delivery included to the United States

Exploring Oracle Primavera P6 R8.4

Exploring Oracle Primavera P6 R8.4

Paperback (28 Dec 2016)

Save $1.97

  • RRP $67.37
  • $65.40
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

Exploring Oracle Primavera P6 R8.4 textbook explains the concepts and principles of project management through practical examples, tutorials, and exercises. This enables the users to harness the power of managing projects with Oracle Primavera P6 for their specific use. In this textbook, the author emphasizes on planning, managing and controlling the projects, assigning resources and roles to a project, and producing schedule and resources reports and graphics. This textbook is specially meant for professionals and students in engineering, project management and allied fields in the building industry.

Book information

ISBN: 9781942689508
Publisher: Cadcim Technologies
Imprint: Cadcim Technologies
Pub date:
Language: English
Number of pages: 276
Weight: 481g
Height: 235mm
Width: 191mm
Spine width: 15mm