Publisher's Synopsis
The short time frame between funding for the project and the opening date of the Olympics imposed severe the contraints on the development and implementation of the components of MARTA's ITS system.
Paperback (27 May 2014)
Includes delivery to the United States
10+ copies available online - Usually dispatched within 7 days
The short time frame between funding for the project and the opening date of the Olympics imposed severe the contraints on the development and implementation of the components of MARTA's ITS system.
ISBN: | 9781499702934 |
Publisher: | On Demand Publishing, LLC-Create Space |
Imprint: | Createspace |
Pub date: | 27 May 2014 |
Language: | English |
Number of pages: | 128 |
Weight: | 312g |
Height: | 279mm |
Width: | 216mm |
Spine width: | 7mm |